Services
Such companies typically offer a full range of services, from design and development to installation, testing, and maintenance of clean rooms (classes from ISO 9 to ISO 5) (cleanroom classes according to GMP from E to B).
Cleanrooms are designed to provide perfect conditions for maintaining maximum sterility and cleanliness. Such result can be achieved only by using special materials in the production process of Cleanrooms and professional installation methods as well.
We ensure qualitative installation of all Cleanroom parts with 100% compliance with all design requirements. Our company employs only experienced specialists who strictly follow established standards and regulations
The installation process includes several key acpects that eventually ensure compliance with strict requirements for sterility and cleanroom classes.
-
1Appropriate materials use
All installation materials (walls, ceilings, floors) should be able to be cleaned friendly and chemically resistant, also should not release polluting particles and not be a source of dust. All this implies flat and non-porous surfaces resistant to biological contamination
-
2Tightness and density of constructions
Special attention is paid to the tightness of stitches, seams and connections between materials to prevent any contamination. All connections must be hermetically sealed and be easy to clean at the same time
-
3Carefull ventilation and filtration systems execution
The decisive element of installation is ventilation system mounting with a high degree of filtration (e.g. HEPA filters). The system must provide constant air flow with the required level of purity, air exchange rate and maintain stable conditions for temperature, humidity and pressure.
-
4Engineering systems design and installation
Important aspect is the integration of all the engineering systems (electricity, water supply, heating, ventilation, automation) in order to avoid pollution of clean premises. Electrical and other cables shoul be mounted inside the walls of Cleanrooms to minimize contamination.
-
5Minimization of the contact with the external environment
During installation, it is highly important to minimize the access of contaminants from the external environment, using special transfer windows ('mouse holes'), gateways and clean zones for employees who move from less sterile areas to clean ones
-
6Maintenance and cleaning accessibility
All Cleanroom components should be reachable for regular cleaning and maintenance works. Installation should imply the possibility of quick replacement of filters, cleaning air ducts and other elements during regular maintenance.
-
7Standards and certification
Installation of Cleanrooms must comply with strict international and Russian standards (e.g. ISO, GMP, DIN). This includes regular inspections, systems testing and vast documentation flow at all stages
-
8Pollution level control
During installation, the level of airborne pollutants is permanently monitored and tested for compliance with the specified cleanroom class is carried out. This is a mandatory stage that confirms meeting all the requirements in fact.
-
9Installation features for different cleanroom classes
For rooms with a higher class, installation requirements are more rigid, for example, it is obligatory to use the materials with a lower level of particle emission as well as the use of additional filtration systems and air-tight compounds
-
10Operating and safety instructions
At the installation stage, it is also important to prepare operating and safety instructions for each type of activities inside Cleanrooms, including requirements for personnel, clothing and procedures.
All these installation features help to create a Cleanroom that meets international safety and sterility standards, providing the necessary conditions for effective work in such environments.

Installation stages
-
Assembly and mounting of Cleanroom constructional elements
-
Installation of ventilation and air conditioning systems
-
Connection of control and monitoring systems
- Commissioning works: checking all systems operations, ensuring that room parameters comply with initial requirements